

Step 4
Once you have the Drilling Guide flush with the concrete, switch your drill bit to the 5/8 inch bit to create the hole for your Vapor Pin®.



Step 8
Place the small hole located in the handle of the Installation/Extraction Tool, over the Vapor Pin® to protect the barb fitting and tap the Vapor Pin® into place.


Step 12
Allow 20 minutes or more (consult applicable guidance for your situation) for the sub-slab soil-gas conditions to re-equilibrate prior to sampling.




